Rough levelling of rain-fed land required over 500 cubic metres of earth moved per hectare. Irrigated land required about 1,000 in Khuzestan and 1,500โ2,500 in Ilam and Bakhtaran, the annex reported, reflecting different terrain and irrigation methods.
No images or videos for this event yet.
Related Events
What earth-moving volume did rough levelling of rain-fed land require?
Rough levelling of rain-fed land required over 500 cubic metres of earth moved per hectare. Irrigated land required about 1,000 in Khuzestan and 1,500โ2,500 in Ilam and Bakhtaran, the annex reported, reflecting different terrain and irrigation methods.
The earth-moving estimates describe cubic metres per hectare rather than the number of machines.
Rough levelling of rain-fed land required over 500 cubic metres of earth moved per hectare. Irrigated land required about 1,000 in Khuzestan and 1,500โ2,500 in Ilam and Bakhtaran, the annex reported, reflecting different terrain and irrigation methods.