Much marine-construction equipment for wreck removal was available in Iran, but heavy-lift cranes of 500โ1,000 tonnes were an exception. The annex also called for advanced detection technology to locate explosives buried beneath silt.
Log in to like or bookmark this story.
๐ Bookmark
No images or videos for this event yet.
Related Events
No quiz questions for this story yet.
The annex stated that all 500โ1,000-tonne heavy-lift cranes needed for clearance were already available in Iran.
๐๐
๐ข
Explanation
Much marine-construction equipment for wreck removal was available in Iran, but heavy-lift cranes of 500โ1,000 tonnes were an exception. The annex also called for advanced detection technology to locate explosives buried beneath silt.