The annex reported Bandar Abbas port construction starting in 1985 and essentially completed during the war, at a cost of $2 billion. Its design capacity was 13 million tonnes annually, providing a major alternative near the Strait of Hormuz.
No images or videos for this event yet.
Related Events
What design capacity did the annex give for Bandar Abbas port?
The annex reported Bandar Abbas port construction starting in 1985 and essentially completed during the war, at a cost of $2 billion. Its design capacity was 13 million tonnes annually, providing a major alternative near the Strait of Hormuz.
Bandar Abbasโs thirteen-million-tonne design capacity is a daily crude-loading rate.
The annex reported Bandar Abbas port construction starting in 1985 and essentially completed during the war, at a cost of $2 billion. Its design capacity was 13 million tonnes annually, providing a major alternative near the Strait of Hormuz.