After attacks, pipelines on the northbound Abadan route were rerouted and buried in two major areas. Station equipment was placed underground or shielded with sand-filled concrete blocks; these precautions added rebuilding time and cost.
Nog geen afbeeldingen of video's voor deze gebeurtenis.
Gerelateerde evenementen
How were vulnerable northbound pipelines protected during reconstruction?
After attacks, pipelines on the northbound Abadan route were rerouted and buried in two major areas. Station equipment was placed underground or shielded with sand-filled concrete blocks; these precautions added rebuilding time and cost.
Protective pipeline and station redesign reduced neither the time nor the cost of rebuilding automatically.
After attacks, pipelines on the northbound Abadan route were rerouted and buried in two major areas. Station equipment was placed underground or shielded with sand-filled concrete blocks; these precautions added rebuilding time and cost.